The primer
Dholera Special Investment Region (SIR) is India's largest and most advanced attempt to build a city from open land rather than grow one from an old one. It lies on the Bhaal, a flat, low-lying coastal plain on the western shore of the Gulf of Khambhat, in the south of Ahmedabad district, Gujarat — roughly 100 to 110 kilometres south-west of Ahmedabad city. On paper it is very large: a planned region of about 920 square kilometres, which makes it one of the largest planned urban footprints in India.
Dholera did not begin as a city — it began as a point on a freight line. It is the flagship node of the Delhi–Mumbai Industrial Corridor (DMIC), an India–Japan industrial programme conceived in the mid-2000s, and it was given its own legal machinery by the Gujarat Special Investment Region Act, 2009. In 2024 it acquired a second identity, as the site of India's first commercial semiconductor fabrication plant, converting a regional planning project into a matter of national industrial strategy.
It is important to read Dholera forwards, from plans and construction milestones toward a finished form that remains roughly fifteen years away. As of mid-2026 the developed heart of Dholera — the Activation Area — covers about 22.5 square kilometres, a little over two per cent of the notified region. The honest summary is the one this platform holds throughout: Dholera in 2026 is a real, funded, government-backed infrastructure project in its early phase, an infrastructure story running ahead of its living-city story.
Read the full guide: What is Dholera SIR? →

Key facts
The figures below mix delivered facts, projects under construction and stated targets — read them in that light. Where sources disagree, a range is given rather than a single confident number.
| Location | Ahmedabad district, Gujarat, on the Gulf of Khambhat ~100–110 km south-west of Ahmedabad city |
|---|---|
| Notified area | ~920 km² 879 km² as originally notified in 2009; on the order of 880–920 km² |
| Developable / urban area | ~580 km² developable; ~422 km² urban Urban development area across the six Town Planning schemes |
| Activation Area | ~22.5 km² built demonstration zone Trunk roads, utilities, drainage and the ABCD command centre — substantially complete |
| Programme | Flagship node of the Delhi–Mumbai Industrial Corridor (DMIC) An India–Japan industrial corridor programme |
| Governance | DSIRDA (planning) + DICDL (delivery SPV) DICDL incorporated Jan 2016 — Gujarat 51% / Government of India 49% |
| Ahmedabad–Dholera Expressway | ~109 km, inaugurated 31 March 2026 Access-controlled; drive time about 45 minutes |
| Dholera International Airport | ~1,426 ha; ~80% complete (mid-July 2026) Target Oct 2026 (slipped from March 2026); Phase 1 ~1.5 million passengers/year (target) |
| Semiconductor fab (Tata Electronics + PSMC) | ~₹91,000 crore; up to 50,000 wafers/month Cabinet-approved 29 Feb 2024; 28–110 nm; ~50% built — first output a target (late 2026 vs 2027–28) |
| Ultra-mega solar park | ~300 MW commissioned Of a reported ~5,000 MW target toward 2030 (phased build) |
| Master-plan horizon | Full phased build toward ~2042 An infrastructure story currently running ahead of the living-city story |
Sources: Sarkhedi (2026) working paper; NICDC; DICDL; Tata Group / PMO. Last verified: 31 July 2026.

Why it matters
Dholera carries the political weight of being the place where the Indian state chose to test whether a world-class city can be manufactured from farmland on a schedule. Its significance now rests on a small number of genuine anchors. The Tata Electronics–PSMC semiconductor fab — approved by the Union Cabinet in February 2024 at a reported investment of up to ₹91,000 crore — is India's first commercial fabrication plant, making the mature-node chips that run cars, appliances and industrial machinery. It is the flagship of the India Semiconductor Mission.
Energy and connectivity are being built to match. An ultra-mega solar park — around 300 MW commissioned of a reported 5,000 MW target — pairs clean power with a power-hungry industrial cluster. The Ahmedabad–Dholera Expressway opened in March 2026, cutting the drive from Ahmedabad to about 45 minutes, and a greenfield international airport and a fast-emerging data-centre cluster are converging on the same coastal plain.
The honest counterweight belongs here too. The land assembly was litigated and stayed at least once; the coastal siting carries real flooding, drainage and salinity risk; timelines have slipped repeatedly; and much of the land is bought speculatively rather than to be used. Dholera's verdict rests on execution over a horizon that extends toward 2042 — which is exactly why a sourced, neutral reference is worth having.
DI's AI
Get a plain-English answer drawn from our sourced, verified data — investing, the airport, land law, builders and more. Every answer links back to the records it used.
Explore visually
Interactive master plan
Hover a zone to explore. Click to open its planning records.
Navigate
Four ways in: ask a question, read the sourced guides, track the news, or compare projects side by side.
Ask any question about Dholera and get a plain-English answer drawn from our sourced records, with links back to the evidence.
Ask a questionA dated, categorised feed of Dholera updates across the airport, semiconductor fab, connectivity and policy.
Read the latestPut projects, zones and infrastructure side by side to weigh them on the same sourced data.
Open compareLatest from Dholera
Reported by The New Indian Express.
Reported by megaproject.com.
Ahmedabad: The Sarkhej-Dholera semi-high-speed double rail line has moved a major step closer to reality, with Western Railway inviting bids for the Rs 18,901.68-crore engineering, procurement and ...
Reported by PIB.
Reported by Realty Plus Magazine.
Questions
Dholera Special Investment Region (SIR) is India's largest greenfield smart-city project and the flagship node of the Delhi–Mumbai Industrial Corridor. It sits on the Gulf of Khambhat, roughly 100–110 km south-west of Ahmedabad in Gujarat, spans on the order of 880–920 km², and was constituted under the Gujarat Special Investment Region Act, 2009. Source: Sarkhedi (2026) working paper; NICDC; DICDL.
As of mid-2026 Dholera is a real, funded, actively-built infrastructure project in its early phase. The ~109 km Ahmedabad–Dholera Expressway opened on 31 March 2026, and trunk infrastructure across the ~22.5 km² Activation Area is substantially complete. The international airport and the semiconductor fab are under construction, not yet operational, and the full city is a phased build toward about 2042. Source: Sarkhedi (2026).
It is India's first commercial semiconductor fabrication plant, a Tata Electronics–PSMC (Taiwan) venture approved by the Union Cabinet on 29 February 2024, with a reported investment of up to about ₹91,000 crore and capacity of up to 50,000 wafer starts per month on mature 28–110 nm nodes. It was reported roughly 50% built in mid-2026; first output is a target — some accounts point to late 2026, others to a 2027–28 ramp. Source: Tata Group (2024); PMO (2024); Sarkhedi (2026).
The greenfield airport near Navagam was reported about 80% complete in mid-July 2026, with a likely operational window of September–October 2026 subject to approvals; an earlier March 2026 target was missed. Phase 1 is designed for about 1.5 million passengers a year. Treat October 2026 as a current target, not a certainty. Source: Sarkhedi (2026).
Dholera SIR lies roughly 100–110 km south-west of Ahmedabad. The ~109 km access-controlled Ahmedabad–Dholera Expressway, inaugurated on 31 March 2026, cuts the drive to about 45 minutes. Source: Sarkhedi (2026).
Dholera is a genuine, government-backed project, but it is an infrastructure story running ahead of its living-city story, and much of its land is bought speculatively. There is no honest single price-per-bigha — a figure only means something for a specific, sourced plot — and appreciation is an expectation, not a promise. Before buying, verify Gujarat RERA registration, confirm clear title and non-agricultural (N.A.) status for the exact survey number, and get an all-in price in writing. Source: Sarkhedi (2026).